DodgeForum.com
DodgeForum.com Home - Dodge Marketplace - Dodge Photo Galleries - Create an Account - Dodge News

Go Back   DodgeForum.com > Dodge Trucks > Dodge Ram > 2nd Gen Ram


Reply
 
Thread Tools Search this Thread
  #1  
Old 05-22-2009, 12:55 AM
wesley11 wesley11 is offline
Registered User
 
Join Date: Apr 2006
Vehicle: 97 dodge laramie slt 4x4
Location: arizona
Posts: 34
Default rtv dry time?

I just replaced my water pump and was wondering how long I should wait before adding coolant to the system. Does the rtv need time time dry> Thanks for any help
This ad is not displayed to registered and logged-in members.
Register your free account today and become a member on Dodge Forums!
Reply With Quote
Sponsored Links
Registered users do not see this ad.
Click here to register for free!
  #2  
Old 05-22-2009, 02:14 AM
speeddemon31176's Avatar
speeddemon31176 speeddemon31176 is offline
All Star
1988 Ford Thunderbird
My Garage
 
Join Date: May 2009
Vehicle: 97 RAM 1500 club cab 4x4
Location: Carbondale,PA
Posts: 754
Default

Add away. The rtv will seal the system as soon as you install the pump. The only thing it will do from there is cure. Don't worry about drying time. Your fine.
Reply With Quote
  #3  
Old 05-22-2009, 02:31 AM
jasonw's Avatar
jasonw jasonw is offline
Champion
2001 Dodge Ram 1500
 
Join Date: Jan 2008
Vehicle: 2001 Dodge Ram 1500 4x4 QC
Location: Sioux Falls, SD
Posts: 3,309
Default

If you look on the back of the RTV tube, it usually tells you the dry time. RTV Black says one hour to set, and then about 12 hours (or 24, can't recall exactly) to fully cure, depending on air temperature.

After an hour, you should be fine to add coolant I'd say, but I wouldn't run the truck anywhere until its fully (or very close to fully) cured.
Reply With Quote
  #4  
Old 05-22-2009, 02:55 AM
Laramie1997's Avatar
Laramie1997 Laramie1997 is online now
The Moderator From Hell
Dodge Forum Moderator
1985 Chevrolet Monte Carlo
My Garage
 
Join Date: Sep 2008
Vehicle: http://www.cardomain.com/ride/3337823
Location: Springfield MO
Posts: 4,234
Send a message via AIM to Laramie1997 Send a message via Yahoo to Laramie1997 Send a message via Skype™ to Laramie1997
Default

Usually best to let that goop cure over night just to be on the safe side.
__________________

Mein Kampf- Yes, I have one of my own
Is now creating sigs Look
Red Truck Club Number 7

To vote in polls
1. Member for 30 days
2. 50 or more posts!
Reply With Quote
  #5  
Old 05-22-2009, 03:49 AM
iwhitne iwhitne is offline
All Star
1998 Dodge Ram 1500
 
Join Date: Jun 2008
Vehicle: 1998 5.9L HS 1.7's, 52MM TB, 14x3, Superchips Tuner, EBC Sport Rotors and "Green Stuff" Pads, FM 40
Location: The Buckeye State... OHIO
Posts: 921
Default

I just did my font/rear diffs.. I applied it.. and installed the part immediatly.. then wait 2 hours before adding in my gear oil.. no leaks so far!
__________________

My photo page updated from time to time:http://www.flickr.com/photos/esacizac/
Reply With Quote
  #6  
Old 05-22-2009, 02:24 PM
J415's Avatar
J415 J415 is online now
All Star
 
Join Date: Feb 2009
Vehicle: 1997 dodge ram 1500 5.2L 4x2
Location: Bay Area, CA
Posts: 781
Default

2 hours is a good time to wait. I always let it dry for 24 hours before adding any fluid. I figure, whats the hurry. If you don't wait enough, then you have to do it again.
__________________
Reply With Quote
Reply



Tags
black, blue, dodge, dry, drying, headers, long, mustang, pump, put, rtv, seal, side, time, wait, water

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off
Forum Jump

Advertising

Featured Sponsors
New Sponsors
All times are GMT -4. The time now is 02:37 AM.

© Internet Brands, Inc.

Powered by vBulletin® Version 3.7.1
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.2.0