Neon SRT-4 Dodge Neon SRT-4 is the pocket rocket that took the import scene and turned it upside down.

Stage 2 w/toys installation time???

Thread Tools
 
Search this Thread
 
Old Feb 27, 2006 | 10:06 PM
  #1  
srt4_roller's Avatar
srt4_roller
Thread Starter
Joined: Jan 2006
Posts: 34
Likes: 0
From:
Default Stage 2 w/toys installation time???

Does anyone know how long it takes to install stage 2 w/ toys???
 
Reply
Old Feb 27, 2006 | 10:38 PM
  #2  
SRT_YA's Avatar
SRT_YA
Record Breaker
Joined: Apr 2004
Posts: 1,458
Likes: 0
From: Michigan - Arctic North
Default RE: Stage 2 w/toys installation time???

plan on about 10 hours give or take, with some breaks in there ;-) a good weekend and you'll be fine. I started mine on a Friday night (8-9pm) and was done by Saturday 5pm or so... and yes I slept like 8 or so hours in there...
 
Reply
Old Feb 28, 2006 | 03:29 AM
  #3  
posthondaremoval's Avatar
posthondaremoval
Record Breaker
Joined: Jun 2004
Posts: 1,740
Likes: 0
From: Phila, PA
Default RE: Stage 2 w/toys installation time???

Worked straight thru the night here with another competent friend and we did it in a littlver 8 hours.

Do bring company/help.
 
Reply
Old Feb 28, 2006 | 12:48 PM
  #4  
flameredsrt's Avatar
flameredsrt
Veteran
Joined: May 2005
Posts: 363
Likes: 0
From:
Default RE: Stage 2 w/toys installation time???

I got everything installed but the IC sprayer in about 9 hours,but that was with breaks and the first hour was a goose chase trying to find a bolt for by backed out mount!!!Definately have someone to keep you from breaking the lil beast(it gets a lil upsetting)!!!
 
Reply




All times are GMT -4. The time now is 03:46 AM.