2nd Gen Durango 2004 - 2009

need frame specs

Old Apr 10, 2014 | 08:54 PM
  #1  
deck60's Avatar
deck60
Thread Starter
|
Rookie
Joined: Sep 2010
Posts: 62
Likes: 0
From: South Dakota
Default need frame specs

I have an 05 durango that my ex pulled out into oncoming traffic and got hit in the side in the front and the rear I can see the axle is pushed over and the front frame horns are pushed over if I can get it close to take it and have final tweaks done
 
Reply
Old Apr 22, 2014 | 10:16 PM
  #2  
master tech's Avatar
master tech
Site Moderator & Tech
15 Year Member
Joined: Apr 2007
Posts: 11,642
Likes: 108
From: Near Sacramento,ca
Default

Pm me your email address and I'll sent you a picture of the frame and specs.

WELD PROCESS

CAUTION: All welds should conform to DaimlerChrysler vehicle engineering process standard “PS 9472”.

WELDING PARAMETERS


WELDING PROCESS

FLUX CORED ARC

GAS METAL ARC (MIG)*

SHIELDED METAL ARC (STICK)

Material Thickness 3.7 mm to 4.2 mm 3.7 mm to 4.2 mm 3.7 mm to 4.2 mm
Electrode Type Lincoln Electrical Co. Product #: NR-211 MP (Do Not Substitute) AWS ER70S-3 (Do Not Substitute) ** AWS E 7018
Electrodes Size Inches .045 Tubular .035 Solid 3/32"
Electrode Stick Out 3/8" - 1/2" 1/2" - 5/8" N/A
Polarity Electrode "-" Work Piece "+" Electrode "+" Work Piece "-" Electrode "+" Work Piece "-"
Shielding Gas Self Shielded 75% Ar 25% CO2 Self Shielded
Gas Flow Rate N/A 25 - 35 CFM N/A
Wire Feed Speed (inches per minute) 110 - 130 Vertical Down 70 - 90 Flat & Overhead 245 - 250 Vertical Down 210 - 225 Flat & Overhead N/A
Approximate Amperage
Vertical 110 - 130 175 85 (3/32" Diameter)
Flat & Overhead 70 - 90 155 90 (3/32" Diameter)
Voltage 15 - 18 19 - 20 N/A
Direction of Welding
Vertical Vertical Down Hill (only) Vertical Down Hill (only) Vertical - Up Hill (only)
Flat & Overhead Flat - Push or Drag Flat - Push or Drag Flat - Drag


*First choice - Gas Metal Arc Welding Process: Butt joints - apply two layers (passes) of weld metal. First pass should only fill approximately ½ the thickness. Vertical position welds - maintain electrode wire at leading edge of weld puddle while traveling down hill to produce maximum penetration into the sleeve. These techniques work for FCAW as well.

**E7018 new electrodes may be exposed to the atmosphere for up to ten hours with no harmful effect. Reconditioning schedules should come from the manufacturer.
 