Manufacturing Codes
Order Received (BA)
Fleet Hold(BB)
Engineering Hold (BD)
Edit Error(BE)
Pass Edit before procurements (BG)
Pass Edit (BX)
Sub Firm Schedule(C)
Firm Schedule (D)
Gate Line Schedule (D1)
In Framing (E)
In Paint (F)
In Trim (G)
Built not OK (I)
Built (J)
Storage (JS)
Shipped (KZ)
Delivered (X)
Fleet Hold(BB)
Engineering Hold (BD)
Edit Error(BE)
Pass Edit before procurements (BG)
Pass Edit (BX)
Sub Firm Schedule(C)
Firm Schedule (D)
Gate Line Schedule (D1)
In Framing (E)
In Paint (F)
In Trim (G)
Built not OK (I)
Built (J)
Storage (JS)
Shipped (KZ)
Delivered (X)